top of page
Search

StingRay 76 2nd flight - structure certification

I usually perform several loop maneuvers as a certification process of the main structural element during the first flight. However, due to the location of the sun and the difficulty with the airspace, it was completed during the 2nd flight. The radius of the loop was much smaller than expected.


22 views0 comments

コメント


bottom of page